Happy Anniversary, KyKat!
SMM, when there were major renovations to my library, the original plan was to have us all stay in place while the additions were being done. HA!
It didn't last long! On the very first day of work, a construction guy fell and broke his leg. And it went downhill from there.
During the course of the first few months, we had standing rainwater on the floors, and lots of electrical and computer cords sitting in that water, it got unbearably hot because we couldn't use the AC and it was over 100 degrees inside the building ad the windows were all covered with black plastic, pieces of ceiling tile were falling in my department, and finally, they found asbestos in the basement.
That meant we -had- to evacuate. The reference department and circulation moved to the Student Center, in the basement. They modified the old bowling alleys (the joke was "Bowling for Books") to use as a Reference and Circulation point, all the rest of the books were moved to a nasty warehouse that leaked and had rats (eeeuuuu!), and the office staff were moved to an office building adjacent to the warehouse. We were there for almost three years!
Posted 2 years ago by Siobhan #